Duty to Consult: 2021-2022 Baseload Energy Corp. – Mineral Exploration Program – Hook Lake Project

dtc_baseload_helidrill.jpg

What type of activities will occur?

·        Up to 15 drill holes along with helicopter landing pads where required.

·        No new trails have been requested however some branches or smaller vegetation may be cleaned to make way for the water line needed between the drill and the water source.

·        If approved, all drill pads size is proposed to be 10 meters by 10 meters and helicopter pads, if natural openings not nearby, are proposed to be no larger than 20 meters by 20 meters in size.

·        Clearing of helicopter/drill pads, core logging/storage area or any brushing of waterline trail would be completed with hand tools (e.g. Chainsaws, axes, etc.).

·        No Temporary Work Camp Permit is required as personnel will be based out of KM147 Outfitters or Points North. The helicopter assisted drilling project work is scheduled to be carried out sometime between July 2021 and December 2022.

 When will these activities occur (Permit Length)?  If approved, July 2021 to December 2022.

 If you have any comments or concerns, please contact your local Community Land Technician or Environmental Land Use Planner at 306-477-1251.

Previous
Previous

Duty to Consult: IsoEnergy North Thorburn Lake Exploration

Next
Next

Duty to Consult: Appia Energy Mineral Exploration Project Proposal at the Alces Lake Property in Northern Saskatchewan