Duty to Consult: Purepoint’s Tabbernor Project
Who? Purepoint
Where? The Tabbernor Project is located approximately 30 km south of Wollaston Lake
What type of activities will occur? Mineral exploration activities, including:
Access
• Access to site will be by helicopter, float plane, boat or on foot depending on the
location
• Main access will utilize highway 905
Temporary Work Camp
• 6 Temporary work camp locations are requested
Diamond Drilling
• Maximum of 40 drill locations; no ice drilling
• Maximum drill pad size – 30m x 30m (900m²)
• Clearing in relation to a helicopter supported drilling program will be hand
cleared
• Helicopter will be required
Soil Sampling
• 5000 soil samples using trowel or soil auger
• Access will be on foot or use existing trails
• No new trails will be cleared
When will these activities occur (Estimated Permit Length)? 2025 to 2027