Duty to Consult: Purepoint’s Tabbernor Project

Who? Purepoint

Where? The Tabbernor Project is located approximately 30 km south of Wollaston Lake

What type of activities will occur? Mineral exploration activities, including:

Access

• Access to site will be by helicopter, float plane, boat or on foot depending on the

location

• Main access will utilize highway 905

Temporary Work Camp

• 6 Temporary work camp locations are requested

Diamond Drilling

• Maximum of 40 drill locations; no ice drilling

• Maximum drill pad size – 30m x 30m (900m²)

• Clearing in relation to a helicopter supported drilling program will be hand

cleared

• Helicopter will be required

Soil Sampling

• 5000 soil samples using trowel or soil auger

• Access will be on foot or use existing trails

• No new trails will be cleared

When will these activities occur (Estimated Permit Length)? 2025 to 2027