Duty to Consult: Cosa’s Darby Project
Who? Cosa
Where? The Darby Project is located approximately 100 km west of Wollaston Lake
What type of activities will occur? Mineral exploration activities, including:
Access
• Access to site will be by helicopter, aircraft, snowcat, skidoo, pickup, or ATV; existing trails will be utilized where possible
• Up to 15 km of trails to be cleared for heavy equipment access
Temporary Work Camp
• 1 Temporary work camp location has been requested
Diamond Drilling
• Maximum of 30 drill locations; no ice drilling
• Maximum drill pad size – 30 m x 30 m (900 m²)
• Helicopters may be required for a portion of the project
Line Cutting and Geophysical Programs
• Width of cut lines will in no case exceed 1.5 m
• Geophysical surveys will include borehole and airborne surveys
When will these activities occur (Estimated Permit Length)? April 2025 to April 2026