Duty to Consult: Foremost CLK Project
Who? Foremost Clean Energy
Where? The CLK Project is located approximately 40 km southwest of Stony Rapids and Black Lake
What type of activities will occur? Mineral exploration activities, including:
Diamond Drilling
• Maximum of 30 drill holes
• 20 drill collars on land
• 10 drill collars on ice
• Maximum drill pad size – 30m x 30m (900m²)
• Helicopter assisted, helicopter pads will be required
• Drill holes may be located within the 30-100 meters of shoreline buffer zone
• Borehole Geophysical surveys
Line Cutting and Ground Geophysical Surveys
• Access to grid locations will be helicopter supported or by existing access trails. No new trails are anticipated.
• Up to 60 km of new grid lines
• Up to 60 km line slashing
When will these activities occur (Estimated Permit Length)? December 2025 to December 2027