Duty to Consult: Purepoint’s Full Moon Project
Who? Purepoint
Where? The Full Moon Project is located approximately 26 km northeast of Points North Landing
What type of activities will occur? Mineral exploration activities, including:
Access
• Access to site will be by helicopter, float plane, boat, or on foot depending on the location
• Existing trails will be utilized where possible
• Up to 25 km of trails to be cleared for heavy equipment access
Temporary Work Camp
• Temporary work camp location has been requested
Diamond Drilling
• Maximum of 50 drill locations; no ice drilling
• Maximum drill pad size – 30 m x 30 m (900 m²)
• Helicopters will be required for a portion of the project; helicopter pads will utilize open areas to minimize clearing
Soil Sampling and Ambient Noise Tomography
• Soil samples will be taken using trowel or soil auger
• Ambient Noise Tomography will not cause any disturbance
• Access will be on foot or by helicopter
• No new trails will be cleared
When will these activities occur (Estimated Permit Length)? 2025 to 2027