Duty to Consult: Appia Energy Corp. Alces Lake Exploration

dtc appia alces lake summer 2020 facebook post.jpg

What type of activities will occur?

1. Repair access trail (for ATV access to camp and site) and upgrade work camp.

2. Ground geophysical surveying (determine minerals in the ground).

3. Airborne geophysical surveying (determine minerals in the ground).

4. Ground radiometric prospecting (mineral analysis), mapping, surface sampling, excavating of soil and rocks, and digging trenches. The trenching is proposed for a number of key targets within an overall area measuring 1000 m x 250 m to expose possible mineralized bedrock and cutting of trees and vegetation will be limited to areas measuring 25 m x 25 m.

5. Up to 200 drill holes (6000 m to 10,000 m) are proposed and vegetation clearing for drill pads for two drill rigs will be limited to areas measuring 20 m x 20 m.

Permit Information (length, start and end date): July 2020 to March 2022.

When will the work happen? Start in late July (if approved) and periodically up until March 2022.

If you have any comments or concerns, please contact your local Community Land Technician or Environmental Land Use Planner at 306-477-1251.

Previous
Previous

Notice: Hatchet Lake Core Re-Logging Program

Next
Next

Duty to Consult: IsoEnergy Larocque East