Duty to Consult: IsoEnergy Ltd. Proposed 2022-2023 Edge Mineral Exploration Project

What type of activities will occur?

  1. The proposed IsoEnergy Ltd. mineral exploration program consists of a 6-hole helicopter-assisted diamond drilling northwest of Hatchet Lake.

  2. The project work will be carried out from the existing Larocque Lake East Camp where personnel will be accommodated.

  3. Drill pads and associated helicopter pads will be cleared with hand tools to a maximum size of 900 m2 (30 meters by 30 meters).

  4. No equipment will be used and no trails will be cleared or refurbished for the project.

  5. Historic openings or drill pads will be re-purposed as helicopter pads wherever possible.

When will these activities occur? If approved, the duration of the drilling program is estimated to be completed over a 4-week period between June 2022 and November 2023.

If you have any comments or concerns, please contact your local Community Land Technician or Environmental Land Use Planner at 306-477-1251.

Previous
Previous

Duty to Consult: 2022-2023 Fission 3.0 Corp – Murphy Lake Mineral Exploration Project Diamond Drilling, Ground Geophysical Survey and Line Cutting

Next
Next

Duty to Consult: Medaro Yurchison