Duty to Consult: ALX Resources Corp. Proposed Project to Conduct a Drilling Program, Ground-based Geophysics, Prospecting, and Outcrop/Soil Sampling

dtc alx flying vee 2.jpg

What type of activities will occur?

1. Drilling - up to 100 land-based drill holes. Drill pads will be established and each pad will be no larger than 20 x 20 m.

2. Line-cutting to accommodate the geophysical portion of the program. May require up to 100 line kilometers at a width of no more than 1 meter.

3. Prospecting and Outcrop/Soil Sampling with minimal to no disturbance.

4. A temporary work camp may be required and will be located at the northeast end of Day Lake.  This camp will be no larger than 0.5 hectares and may require a dock to accommodate the float plane or helicopter that is required to access the site.  

5. It is estimated that the cleared area, for a maximum of 100 drill holes, will total approximately 40,000 square meters or 4.0 hectares

When will this work happen? Begin in Fall 2020 if approved.

Permit Length: Fall 2020 to April 2022.